Contact Us

    • Xuzhou Beibang Machinery Co., Ltd

    • Tel: +86-516-83666687

    • Fax: +86-516-83578116

    • Workshop add:No.3 Jingshan road, Jin Shanqiao development zone, Xuzhou city, China

    • Email: [email protected]

    • Mob/Whatsup/Viber:+86-13952171582/+86-13913451806/+86-13952171592

    • Office Add: No.65-1,East Third Ring Road,Xuzhou City,China.

Home > NEWS>Two Cranes Wing to Fly which Showed XCMG’s Great Power

Two Cranes Wing to Fly which Showed XCMG’s Great Power

Recently, XCMG’s two giant crawler cranes of 4,000-tonnage and 1,000-tonnage cooperated under the vast blue sky of Ningxia, and extended booms like two cranes wing to fly. They slowly hoisted a tank of 1,900 tons, precisely delivered it to the specified position, and perfectly finished hoisting task again.

At Ningxia Coal Industry Group’s chemical product production base in Ningdong Town, Yinchuan City, the main crane of XGC88000 used operating condition of boom of 84 meters and multiplying factor of 88, while the XGC16000 crawler crane for tail flip-slip used operating condition of boom of 42 meters and multiplying factor of 48. The two ‘brothers’ of XCMG closely cooperated and worked flexibly, and successfully hoisted the tank to the specified position within only about 2 hours, which reflected the immense power of XCMG’s products as treasures of the country.


As the world’s largest-tonnage crane, XCMG’s 4,000-tonnage crawler crane made loads of achievements in Ningxia after finishing its first task perfectly in Yantai. The crawler crane had completely finished hoisting tasks of 8 important tanks of the project within only 4 months. A series of successful hoisting cases demonstrated the safe, reliable and effective product performance of XCMG’s cranes, and highlighted the ruggedness, durability and outstanding flexibility of XCMG’s products. According to person in charge of the project, ‘thanks to the perfect performance of XCMG’s super tonnage crawler crane, the project finished over 1 month ahead of schedule, which gained precious time for the engineering later.’